5-TRANSPORTOPERATIONS
Unloading
1.Removetheblocksandfasteningchains.
2.Starttheengine.
3.Pushthefunctioncancellationleverforward(safety
barinoutwardposition).
4.(Machinewithattachment)
Raisetheattachmenttobringitafewcentimetres
abovethetrailerbed.
5.Selectlowtravelspeed.
6.Movethemachineforwardslowly,raisingtheattach-
ment(ifequipped)soastokeepitafewcentimetres
offtheground.
7.Turntherearviewmirrorsbacktotheircorrectposi-
tion.
8.(Machinewithoutattachment)
Installtheattachmentandthecounterweight.
NOTICE:Whentheattachmenthasbeeninstalled,allair
mustberemovedfromthehydrauliccircuitandthema-
chinemustbetestedforcorrectoperation.Donotforget
tochecktheoillevel.
5-7