EasyManua.ls Logo

CEM BLADE - Page 20

CEM BLADE
72 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
16
System Installation
6. Remove the foam from the top of the system.
7. Lay the sides of the box at and remove the foam from the top of the system.
8. Open the plastic surround the instrument to allow access to the instrument. DO NOT leave the plastic under
the system.
9. Using two people, locate the cutouts in the foam on the sides of the instrument and lift onto the bench top
near exhaust service. DO NOT place the system in a fume hood.

Table of Contents

Related product manuals