MIO/UMIO cards must be returned with all SFP+ transceivers installed. Replacement MIO/UMIO cards
are shipped with new SFP+ transceivers installed.
Important
The packaging sequence is as follows:
Step 1
Place the card inside the ESD bag; fold over and seal the bag with an ESD Label as shown in the figure below.
Figure 39: Rear Card Packaging
Step 2
Place the card in the carton as shown in the figure below.
Step 3
Place the top piece of foam over the card.
Step 4
Close the carton and seal it with shipping tape. See Sealing the Shipment, on page 172.
Step 5
Place the shipping label on the outside of the carton. See Labeling the Shipment, on page 172.
ASR 5500 Installation Guide
175
RMA Shipping Procedures
Rear Cards