This setpoint is used to adjust the delay of starting the next gen-set when the
actual load reserve drops below the adjusted reserve for start, but the group
is still not overloaded.
NOTE:
# sign in the name of this setpoint marks that this setpoint is shared among
all controllers connected by CAN2 bus.
If the system reserve drops below the start limit for next gen-set the delay
#NextStrt del will begin to count down. But if the load raises too quickly it
might happen that the system gets overloaded already before the delay
#NextStrt del reaches zero.
This setpoint is used to prevent this situation. If the #NextStrt del timer is
already counting down (i.e. the condition for starting of next gen-set based
on reserves is fullfiled), the total load of running gen-sets reach 90% of
their nominal capacity and the remaining time of the running timer is higher
than #OverldNextDel, the running timer is shortened to the value of
#OverldNextDel to speed up the start-up of the next gen-set.
NOTE:
The setpoint takes place only in island operation.
NOTE:
# sign in the name of this setpoint marks that this setpoint is shared among
all controllers connected by CAN2 bus.
This setpoint is used to adjust the delay of stopping the next gen-set when
the actual load reserve rises above the adjusted load reserve for stop.
NOTE: