EasyManua.ls Logo

ComAp InteliMains NT IM-NT-BB - Page 242

ComAp InteliMains NT IM-NT-BB
437 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
InteliMains
NT
, SW version 3.2.0
InteliMains-NT-MCB-MGCB-3.2.0-Reference Guide.pdf, ©ComAp April 2015
242
Related FW
standard v3.1.0
Description
This setpoint is used to adjust the delay of starting the next gen-set when the
actual load reserve drops below the adjusted reserve for start, but the group
is still not overloaded.
NOTE:
# sign in the name of this setpoint marks that this setpoint is shared among
all controllers connected by CAN2 bus.
11.2.9.23 Setpoint: #OverldNext Del
Group
Pwr Management
Range [units]
0 .. 3600 [s]
Related FW
standard v3.1.0
Description
If the system reserve drops below the start limit for next gen-set the delay
#NextStrt del will begin to count down. But if the load raises too quickly it
might happen that the system gets overloaded already before the delay
#NextStrt del reaches zero.
This setpoint is used to prevent this situation. If the #NextStrt del timer is
already counting down (i.e. the condition for starting of next gen-set based
on reserves is fullfiled), the total load of running gen-sets reach 90% of
their nominal capacity and the remaining time of the running timer is higher
than #OverldNextDel, the running timer is shortened to the value of
#OverldNextDel to speed up the start-up of the next gen-set.
NOTE:
The setpoint takes place only in island operation.
NOTE:
# sign in the name of this setpoint marks that this setpoint is shared among
all controllers connected by CAN2 bus.
11.2.9.24 Setpoint: #NextStopDel
Group
Pwr Management
Range [units]
0 .. 3600 [s]
Related FW
standard v3.1.0
Description
This setpoint is used to adjust the delay of stopping the next gen-set when
the actual load reserve rises above the adjusted load reserve for stop.
NOTE:

Table of Contents