EasyManua.ls Logo

ComAp InteliMains NT IM-NT-BB - Page 255

ComAp InteliMains NT IM-NT-BB
437 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
InteliMains
NT
, SW version 3.2.0
InteliMains-NT-MCB-MGCB-3.2.0-Reference Guide.pdf, ©ComAp April 2015
255
adjusted by setpoint MGCB open del the MGCB is then opened regardless of
the bus power. The actual value is calculated as percentage given by this
setpoint from NominMainsImp.
NOTE:
The speed of the ramp is adjusted by the setpoint Load ramp.
11.2.10.12 Setpoint: MGCB open del
Group
Sync/Load Ctrl
Range [units]
Load ramp .. 1800 [s]
Related FW
standard v3.1.0
Force value
possible
YES
Description
This setpoint adjusts the maximum duration of the bus unloading ramp. If the
end point of the ramp (MGCB open level) is not reached within time period
adjusted by this setpoint the MGCB is then opened regardless of the bus
power.
NOTE:
The speed of the ramp is adjusted by the setpoint Load ramp.
11.2.10.13 Setpoint: Sync timeout
Group
Sync/Load Ctrl
Range [units]
1 .. 1800, NO TIMEOUT [s]
Related FW
standard v3.1.0
Description
This setpoint adjusts the maximum duration of forward or reverse
synchronization. If the synchronizing is not successful within this period of
time, the Sync Timeout or RevSyncTimeout alarm will be issued.
NOTE:
If the synchronizing is not successful within 1/10 of the Sync timeout or 60s
(if Sync timeout <600s) the synchronization process is automatically restarted
again, i.e. the speed governor output is reset to bias value in gen-set
controllers and then frequency regulation loop is started again. If NO
TIMEOUT is selected the automatic restart occurs every 180s. This method
helps to sychronize successfully even in difficult conditions.

Table of Contents