Inpositioningthesteamdistributionpipes,thefollowingdimensionsshouldbeobserved.
Note:Pleasenotetheinstructionsintheseparatedocumentationforthisproductwhenlocatingthe
OptiSorp steam distribution system.
Guidelines for dimensioning the ventilation ducts
– Tofacilitatetheinstallationofthesteamdistributionpipesandforcontrolpurposes,asufciently
sizedcontrolopeningshouldbeplanned.
– Withintherangeofthehumidicationdistance,theventilationductshouldbewater-proofed.
– Airductspassingthroughcoldroomsshouldbeinsulatedtopreventthehumidiedairfromcon-
densingalongtheductwall.
– Poorairowconditionswithintheairduct(e.g.causedbyobstacles,tightbends,etc.)canleadto
condensationofthehumidiedair.
– Steam distribution pipes must not be mounted to round ducts.
Ifyouhavequestionsrelatingtothedimensioningofventilationductsincombinationwithsteamhu-
midiers,contactyoursupplier.
Installing the steam pipes/the OptiSorp steam distribution system
Detailedinformationontheinstallationofsteamdistributionpipes/OptiSorpsteamdistributionsystem
can be found in the separate “Mounting Instructions” for this products.
gmin= 150 mm
hmin= 85 mm
min. H= 250 mm H≥400mm min. H= 200 mm
min. H= 400 mm min. H= 350 mm min. H= 300 mm
min. H= 600 mm min. H= 500 mm min. H= 400 mm
min. H=720 mm min. H= 600 mm min. H= 500 mm