EasyManua.ls Logo

Condair Mk5 - Maintenance; Maintenance Overview and Notes

Condair Mk5
64 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
53
6.6 Maintenance
All maintenance work must be performed only by adequately qualied and trained
personnel familiar with the dangers involved.Ascertainingthequalicationsisthe
customer‘s responsibility.
– Instructionsanddetailsconcerningthemaintenanceworkmustbeobservedandad-
heredtowithoutfail.
– Only the type of maintenance work outlined inthis documentation must be carried
out.
– UseoriginalCondairsparepartsexclusivelytoreplacedefectiveparts.
Before maintenance is initiated, the steam humidier must be taken out of op-
eration in accordance with instructions in chapter 6.3 and protected against
unintentional switching on.
6.6.1 Notes on maintenance
Tosafeguardreliableoperation,themaintenanceoftheCondairMk5shouldbedevisedinthreestages.
Adistinctionismadeherebetweenperiodicinspections,smallmaintenanceandextendedmaintenance
ofthesteam-airhumidier.
Theintervalsrequiredbetweensmallmaintenanceandextendedmaintenancedependonthewater
qualityandthequantityofsteamgeneratedandcanbepre-selectedontherotaryswitch“S2”onthe
controlboard(seechapter6.1).Afterexpiryoftheselectedinterval,theyellowLEDashes/lightsand
anappropriatemessagealternateswiththenormaloperationindication.
Note:Werecommendtocarryoutanextendedmaintenanceatleastonceayear,independentlyfrom
the maintenance counter.
The following is an overview of the work that should be undertaken for the three maintenance
stages.
Periodic inspections
When: 1 per week
Work: • Inspectthewaterandsteaminstallationsforcorrectsealinganddamage.
• Inspectthedrainlineforsoiling.
• Inspecttheelectricalinstallationforloosecablesanddamagedcomponents.
• Inspectthesteam-airhumidierfordamage.
Small maintenance
When: The yellow LED ashes and the message sm. maintenance dueappears, alternat-
ingwiththenormaloperationindication.
Work: • Carryouttheperiodicinspectionitems
• Emptythesteamcylinderandcleanthelimecollectortank.
Extended maintenance
When: The yellow LED lights and the message “lg. maintenance dueappears, alternating
withthenormaloperationindication.
Work: • Carryouttheperiodicinspectionitems
• Emptythesteamcylinderandcleanthelimecollectortank.
• Dismantleandcleanthesteamcylinder
• Cleantheunitinnerchamber
• Inspectthecomponentsinsidetheunitfordamage (e.g. heating cable connector
onthesteamcylinder,levelunit,etc.)
sm. maintenance
due
lg. maintenance
due

Table of Contents

Related product manuals