5.5.4 Inspecting the electrical installation
Inspectforcorrectinstallationinaccordancewiththefollowingchecklist:
Dothemainsvoltagesappliedcorrespondtotherespectivedetailsstatedontheratingplate/sfor
thepowerandcontrolcomponents?
Arethevoltagesupplies(Powerandcontrolcomponents)correctlyfused?
Istheserviceswitch“Q”installedinthesupplycabletothepowerandcontrolcomponents?
Areallcomponentscorrectlyconnectedinaccordancewiththeconnectionschematic?
Areallconnectioncablesxed?
Are the connecting cables free of tension (tted through cable glands/secured with cable
clamps?)
Istherotaryswitch“S3”settocorrespondwiththecontroller(active,passive,On/Off)orhumidity
sensor?
Isjumper“JP2”onthecontrolboardcorrectlysetforthecontrollerused?