5.4.2 Inspecting the water installation
Usethefollowingchecklisttoascertainthattheinstallationhasbeenperformedcorrectly:
– Water supply
Hasltervalveorshut-offvalveandlter125 µm respectively been installed in supply line?
Haveadmissiblewaterpressure(1.0–10bar)andtemperature(1–40°C)beenobserved?
Doessupplycapacitymatchthehumidier(s)?
Areallpipesproperlysecured(threadedconnectionstightened)?
Is the feed pipe properly sealed?
– Water drain
Has minimum inside diameter of drain pipes been maintained at least 40 mm throughout the
entire length?
Hasdrainpipebeeninstalledwithadownslopeofatleast10%?
Hastheheatresistanceofthematerialusedbeenveriedtobeatleast100°C?
Arehosesandlinesproperlysecured(hoseclampsandthreadedconnectionstightened)?