EasyManua.ls Logo

Condair RM2 - Page 51

Condair RM2
72 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
51Maintenance
9. Place an empty container with at least 10 l capacity beside the lter cartridge and lead the open end
of the bypass hose into that container.
10 l
Fig. 14: Lead bypass hose into an empty container
10. Turn valve in the lter head in such a way, that "open" points to "Bypass" (ushing position, see Fig.
15).
to Condair RMSupply
Bypass
Fig. 15: Turn valve to "Bypass" (ushing position)
11. Carefully open the shut-off valve in the water supply line to the Condair RM (slowly) and let water
ow into the container (approx. 5 l) until it emerges without bubbles. Then close the shut-off valve
in the water supply line again.
Note: This step is important because during this ushing process the lter cartridge is lled with water
and loose particles from the manufacturing process are ushed out. A milky or dark discolouration
of the water owing out is normal and does not indicate a contamination.

Table of Contents

Related product manuals