EasyManua.ls Logo

Daikin Altherma 3 R ECH2O - Dials and buttons

Daikin Altherma 3 R ECH2O
344 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3 Set-up and installation
Installation and operating manual
17
Daikin Altherma EHS(X/H)(B)-D
Daikin Altherma 3 R ECHO
008.1451099_00 – 07/2020
11 Secure the manifold with securing clip (itemg) in its mounting
again.
12 Insert the two connection couplings (item b) through the
retaining plate into the lateral mountings.
13 Secure the two connection couplings with securing clips (itemc)
in their mountings.
14 Insert the sealing plug (iteme) in the upper mounting.
15 Secure the sealing plug with securing clip (itemd).
3‒18 Heating inflow and return flow connections aligned to the
rear
a Retaining plate
b Connection coupling
c Securing clip of the connection couplings
d Securing clip of the sealing plug
e Sealing plug
f Manifold
g Securing clip of the manifold
h Elbow
16 Cut out side openings in the thermal insulation (itema) using a
suitable tool.
 3‒19 Cut-out in thermal insulation
a Side openings in the thermal insulation
3.4.8 Making the hood opening
1 With the heating inflow and return flow directed upwards: Cut
the hood along the perforation with a suitable tool.
 3‒20 Making the hood opening
3.4.9 Installing the rotary switch of the
controller
1 Place the rotary switch on the rotary switch holder of the RoCon
+ HP1 and press it on.
 3‒21 Putting on the rotary switch
3.4.10 Securing the hood
After the installation is fully completed:
1 Attach the screws for fixing the hood (accessory bag).
2 Place the front cover straight over the rotary switch of the
RoCon+ HP1. Press on the top and bottom until the front
screen is securely engaged again.
 3‒22 Securing the hood

Table of Contents

Other manuals for Daikin Altherma 3 R ECH2O

Related product manuals