092-Load Subtract-Add
Delay
This is the minimum delay required for a
load_add pulse after a load_substract
pulse. Review chapter “Load Shedding”
for more details.
This is the time between the mains
voltages and frequency entered within
the limits and the generator contactor is
deactivated.
094-Mains Connection
Topology
This is the connection topology of mains
voltages and CTs. Detailed
explanations are given in the chapter:
“TOPOLOGIES”.
0: 2 phase, 3 wire L1-L2
1: 2 phase, 3 wire L1-L3
2: 3 phase, 3 wire
3: 3 phase, 3 wire, 2CTs L1-L2
4: 3 phase, 3 wire, 2CTs L1-L3
5: 3 phase, 4 wire star
6: 3 phase, 4 wire delta
7: single phase, 2 wire
095-Genset Connection
Topology
This is the connection topology of
genset voltages and CTs. Detailed
explanations are given in the chapter:
TOPOLOGIES.
0: 2 phase, 3 wire L1-L2
1: 2 phase, 3 wire L1-L3
2: 3 phase, 3 wire
3: 3 phase, 3 wire, 2CTs L1-L2
4: 3 phase, 3 wire, 2CTs L1-L3
5: 3 phase, 4 wire star
6: 3 phase, 4 wire delta
7: single phase, 2 wire
096-Mains Contactor
Timer
This is the period after the generator
contactor has been deactivated and
before the mains contactor has been
activated.
097-Mains MCB Close
Pulse
After the mains MCB_undervoltage coil
is energized and mains
MCB_undervoltage coil timer is
elapsed, the mains MCB_close relay
will be activated during this period.
Review chapter “Motorized Circuit
Breaker Control” for more details.
The mains MCB_open relay will be
activated during this period.
Review chapter “Motorized Circuit
Breaker Control” for more details.
099-Mains MCB Under
Voltage Coil Timer
The mains MCB_undervoltage coil is
energized during this period before the
mains MCB_close relay is activated.
Review chapter “Motorized Circuit
Breaker Control” for more details.