EasyManua.ls Logo

Datakom D-100 MK2 - Page 73

Datakom D-100 MK2
123 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
D-100 MK2 User Manual Firmware V-6.3
K96D01-EN - 73 -
Parameter Definition
Unit
Min
Max
Factor
y Set
Description
101-Mains MCB Fail
Timer
sec
0
600
2.0
If a mains MCB feedback input is
defined and if the mains MCB fails to
change position before the expiration of
this timer, then a fault condition occurs.
102-Mains Phase Order
Check Enable
-
0
1
0
0: mains phase order checking disabled
1: if mains phase order is faulty, then a
warning is given and mains contactor
deenergized.
103-Genset Contactor
Timer
sec
0
600
0.5
This is the period after the mains
contactor has been deactivated and
before the genset contactor has been
activated.
104-Genset MCB Close
Pulse
sec
0
10
0.5
After the genset MCB_undervoltage coil
is energized and genset
MCB_undervoltage coil timer is elapsed,
the genset MCB_close relay will be
activated during this period.
Review chapter “Motorized Circuit
Breaker Control” for more details.
105-Genset MCB Open
Pulse
sec
0
10
0.5
The genset MCB_open relay will be
activated during this period.
Review chapter “Motorized Circuit
Breaker Control” for more details.
106-Genset MCB Under
Voltage Coil Timer
sec
0
10
0.5
The genset MCB_undervoltage coil is
energized during this period before the
genset MCB_close relay is activated.
Review chapter “Motorized Circuit
Breaker Control” for more details.
107-GCB Alarm Level
-
0
1
0
0: shutdown alarm
1: loaddump alarm
108-Genset MCB Fail
Timer
sec
0
600
2.0
If a genset MCB feedback input is
defined and if the genset MCB fails to
change position before the expiration of
this timer, then a fault condition occurs.
109-Genset Phase Order
Check Enable
-
0
1
0
0: genset phase order checking disabled
1: if genset phase order is faulty, then a
genset phase order fail loaddump alarm
is given.
110-Multi Load Subtract
Power Level
kW
0
65000
0
When the genset active power goes over
this limit, the controller will start
subtracting load as described in chapter
Five Step Load Management.
111-Multi Load Add
Power Level
kW
0
65000
0
When the genset active power goes
below this limit, the controller will start
adding load as described in chapter Five
Step Load Management.
112-Multi Load Subtract
Start Delay
sec
0
36000
0
If the load stays over the Multi Load
Subtract Power Level parameter during
this timer, then 1 step of load is
subtracted.
113-Multi Load Subtract
Wait Delay
sec
0
36000
0
This is the minimum period between two
load subtract operations.
114-Multi Load Add Start
Delay
sec
0
36000
0
If the load stays below the Multi Load
Add Power Level parameter during this
timer, then 1 step of load is added.
115-Multi Load Add Wait
Delay
sec
0
36000
0
This is the minimum period between two
load add operations.

Table of Contents

Related product manuals