EasyManua.ls Logo

Datakom D-100 MK2 - Page 73

Datakom D-100 MK2
123 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
D-100 MK2 User Manual Firmware V-6.3
K96D01-EN - 73 -
Parameter Definition
Unit
Min
Max
Factor
y Set
Description
101-Mains MCB Fail
Timer
sec
0
600
2.0
If a mains MCB feedback input is
defined and if the mains MCB fails to
change position before the expiration of
this timer, then a fault condition occurs.
102-Mains Phase Order
Check Enable
-
0
1
0
0: mains phase order checking disabled
1: if mains phase order is faulty, then a
warning is given and mains contactor
deenergized.
103-Genset Contactor
Timer
sec
0
600
0.5
This is the period after the mains
contactor has been deactivated and
before the genset contactor has been
activated.
104-Genset MCB Close
Pulse
sec
0
10
0.5
After the genset MCB_undervoltage coil
is energized and genset
MCB_undervoltage coil timer is elapsed,
the genset MCB_close relay will be
activated during this period.
Review chapter “Motorized Circuit
Breaker Control” for more details.
105-Genset MCB Open
Pulse
sec
0
10
0.5
The genset MCB_open relay will be
activated during this period.
Review chapter “Motorized Circuit
Breaker Control” for more details.
106-Genset MCB Under
Voltage Coil Timer
sec
0
10
0.5
The genset MCB_undervoltage coil is
energized during this period before the
genset MCB_close relay is activated.
Review chapter “Motorized Circuit
Breaker Control” for more details.
107-GCB Alarm Level
-
0
1
0
0: shutdown alarm
1: loaddump alarm
108-Genset MCB Fail
Timer
sec
0
600
2.0
If a genset MCB feedback input is
defined and if the genset MCB fails to
change position before the expiration of
this timer, then a fault condition occurs.
109-Genset Phase Order
Check Enable
-
0
1
0
0: genset phase order checking disabled
1: if genset phase order is faulty, then a
genset phase order fail loaddump alarm
is given.
110-Multi Load Subtract
Power Level
kW
0
65000
0
When the genset active power goes over
this limit, the controller will start
subtracting load as described in chapter
Five Step Load Management.
111-Multi Load Add
Power Level
kW
0
65000
0
When the genset active power goes
below this limit, the controller will start
adding load as described in chapter Five
Step Load Management.
112-Multi Load Subtract
Start Delay
sec
0
36000
0
If the load stays over the Multi Load
Subtract Power Level parameter during
this timer, then 1 step of load is
subtracted.
113-Multi Load Subtract
Wait Delay
sec
0
36000
0
This is the minimum period between two
load subtract operations.
114-Multi Load Add Start
Delay
sec
0
36000
0
If the load stays below the Multi Load
Add Power Level parameter during this
timer, then 1 step of load is added.
115-Multi Load Add Wait
Delay
sec
0
36000
0
This is the minimum period between two
load add operations.

Table of Contents

Related product manuals