4.2.4. Standby
Standby process is executed when the instrument is in ready state and the standby time
(see Service Settings) ellapsed
In the beginning of the standby process the needle goes up and is washed and the
chambers are drained. After this the 3.0 ml diluent is put into MIX (via needle) and the
RBC chamber (via V8), and the diluent from the MIX is transferred into the WBC
chamber and at last MIX chamber is filled with 1 ml of diluent and the back side of the
apertures are primed. The diluent in the chambers prevent the apertures and chambers
from dirt, drying out and salt build up.