152 Instructions for use Isolette 8000 plus SW 5.n
Service
13.5.1.3 Condensation management system replacement (if installed)
CAUTION
Risk of injury or damage to the device
Noncompliance may result in injury or damage to the device.
► Do not reprocess and reuse single-use components.
► Do not use single-use components or accessories if packaging is damaged.
► If any fluids spill or leak around the device, wipe the area dry to prevent slipping
hazard.
► Check the water level in the collection bottle every 8 hours to avoid overflow.
When the water level reaches the maximum mark on the bottle, replace the
bottle.
CAUTION
Risk of injury or damage to the device
Liquid in the collection bottle can contain patient fluids.
► Collection bottles and fluids should be handled according to hospital guidelines.
When using high levels of humidity, Dräger recommends using the condensation
management system.
The condensation management system must be replaced weekly and, also, with
each new patient.
1 Slowly raise the hood.
2 Remove the mattress.
3 If the incubator is equipped with a weighing scale, perform steps 4 through 6;
otherwise go to step 7.
4 Disconnect the scale cable from the sensor module.
5 Remove the cable from the clamps that hold it to the incubator.
6 Lift the scale from the bed.
7 Remove the bed and X-ray tray.
8 Remove the T-bars.
9 Remove the upper cover.
10 Disconnect the condensation management hose (A) from the collection bottle
located underneath the left side of the incubator.