XS series operating manual
XS user manual v0.55 - 86 -
Multiple ground continuity operation
With the above example, after starting the test the LCD screen shows :
Fig 10.13
The unit waits that the operator press on the ENTER key (or press on the remote control bush button
on the test probe if featured) to start the ground continuity test step (STEP:1)
Then the first step is proceeding.
The first line displays the measurement result.
And the LCD screen shows:
Fig 10.14
As previously the unit goes in standby, waiting for ENTER pressing.
This is done as many times as the number of test steps if the test results are PASS.
Otherwise, the unit offers to the operator the possibility to re-test the FAIL test or to stop the
Sequence (press on ESC).

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Eaton Sefelec RXS50 and is the answer not in the manual?

Eaton Sefelec RXS50 Specifications

General IconGeneral
BrandEaton
ModelSefelec RXS50
CategoryTest Equipment
LanguageEnglish

Related product manuals