4-4 Maintenance
Aquastorm 200
Month/ Year: __________
Annual Maintenance
Procedure Reference
Perform all daily and monthly maintenance procedures
Inspect all wiring for tight connections - tighten if necessary
Inspect fuse blocks for any signs of discoloration and replace if
inspection warrants
Replace all tank float switches approximately every twelve (12) months
of operation or sooner if inspection warrants
Lubricate conveyor drive chain
Lubricate blower motors
Inspect pressure gauge lines - verify they are connected securely and
lines are not damaged.
Inspect contactors - verify contacts are not pitted or worn.
COMMENTS:
(Initial)
Date
__/__/__
(Initial)
Date
__/__/__
(Initial)
Date
__/__/__
(Initial)
Date
__/__/__
(Initial)
Date
__/__/__
(Initial)
Date
__/__/__
(Initial)
Date
__/__/__
(Initial)
Date
__/__/__