Connecting or verifying power cables
Before you begin
Ensure that the cabinet circuit breakers are in the On position, all necessary PDU
switches are switched On, and the power is connected.
On the rear of the cabinet, the power cables connected to PDU A are colored gray and the
power cables for connecting to PDU B are colored black. While the cabling order does not
matter so long as all the cables are connected properly, they have been separated
according to PDU (A or B).
As soon as you connect the power cables, the component starts powering up
automatically. This is normal. Refer to Verifying system status on page 57 for correct
LED status.
Connecting or verifying the gray power cables for PDU A
Verify or connect the power cables as shown in Figure 40 on page 55. Ensure that all
the power cables are locked in place.
Procedure
1. From SP A to PDU A. See cable 1 in Figure 40 on page 55.
Power up
54 EMC VNX Series VNX5600 Unified Installation Guide

Table of Contents

Other manuals for EMC VNX Series

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the EMC VNX Series and is the answer not in the manual?

EMC VNX Series Specifications

General IconGeneral
Management InterfaceUnisphere
Drive SupportSAS, NL-SAS, Flash (SSD)
RAID LevelsRAID 0, 1, 3, 5, 6
Protocols SupportedFibre Channel, iSCSI, NFS, CIFS
Data ServicesDeduplication, Compression, Snapshots, Replication
ProcessorIntel Xeon
Operating SystemVNX Operating Environment (block), VNX File Operating Environment (file)

Related product manuals