8. Tighten the cable gland.
Note
Apply PTFE tape or other sealant to the threads.
Note
Make sure to arrange the wiring with a drip loop.
9. Mount the cover making sure the cover is secure to meet explosion-proof
requirements.
10. Turn the jam screw counterclockwise until it contacts the cover.
Required for Flameproof installations only.
Reference Manual Electrical installation
00809-0100-4530 April 2019
Reference Manual 109