EasyManua.ls Logo

Enterasys SecureStack C2 C2G170-24 - Chapter 3: Hardware Installation; Considerations Prior to Installation; Required Tools; Unpacking the Switch

Enterasys SecureStack C2 C2G170-24
74 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Considerations Prior to Installation
3-2 Hardware Installation
Considerations Prior to Installation
Wheninstallingthesw itch,notethefollowing:
•Beforestartingtheinstallationprocedure, notifythenetworkadministratorofthe
installation.
•Followtheinstallationproceduresintheorderaspresentedinthisguide.
•DonotconnecttheswitchtothenetworkuntilyouhaveestablishedthecorrectIP
address.
Required Tools
APhillipsscrewdriverisrequiredtoinstalltheswitchintoarack.
Unpacking the Switch
Unpacktheswitchasfollows:
1. Openthecartonandremovethepackingmaterialprotectingtheswitch.
2. VerifythecartoncontentswiththeitemslistedinTable 31.
3. Removethetapesealonthenonconductivebagtoremovetheswitch.
4. Performavisualinspectionoftheswitchforanysignsofphysical
damage.Contact
Enterasys N etworksifthereareanysignsofdamage.RefertoGettingHelpon
page 1 5fordetails.
Table 3-1 Contents of Switch Carton
Item Quantity
C2G170-24 switch 1
Mounting kit (two mounting brackets and eight M3x6-mm screws for rack mounting) 1
Rubber feet with adhesive backing for installation on a flat surface 4
AC power cord (type of power cord is country-dependent) 1
This installation guide 1
Customer Release Notes 1
URL notice card 1

Table of Contents

Other manuals for Enterasys SecureStack C2 C2G170-24

Related product manuals