Installation Checklist
Go through the following checklist to ensure you have installed the appliance correctly
Correctly sized cavity to suit your fascia and flue configuration
Correct clearances to combustibles and mantles around the fascia
An electrical isolating switch to the appliance, accessible after finished installation
Correctly sized gas supply with a pressure test point, ensuring adequate supply with all other
gas appliances in the dwelling running
A weather-tight installed horizontal or vertical powerflue terminal with clearance as
specified by AS/NZ5601.1
If chosen, reasonable access to the outside face of the horizontal powerflue wall terminal
for maintenance purposes and flue attached to the rear of the horizontal powerflue wall
terminal leading back to the appliance (and similar for vertical powerflue terminals)
The electrical cable from the powerflue terminal attached correctly and run back to the
appliance cavity in an electrically safe manner
The appliance fixed to the cavity base
The appliance plugged into a mains electricity supply
All gas joints and pressure points leak tested, and suitable leak detection solution and drop
tests completed on gas pipework
Fuel bed correctly installed
Glass correctly fitted
Operated the fire and verified that it lights reliably and safely
Appliance functions checked, including thermostat operation, Eect Only, and Fan Boost
Data label marked up with correct gas type, and dated by installer if converted during
installation