EasyManua.ls Logo

EVS DYVI - Page 50

EVS DYVI
102 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
EVS Broadcast Equipment SA
Issue 2.0.7.2 September 2021
40 Processing Module Installation and Cabling
Note
The Topology Setting must be identical for all Processing
Modules contributing to a Production Cluster (those which
have the same Cluster ID).
For proper network settings and validated devices, please
refer to the limited version of the EVS Network Design
Guide.
For support on network switches and their configuration,
contact your EVS Technical Support.
On how to configure Processing Modules to Dyvi-
‘Productions’ please refer to Supervisor section.

Table of Contents

Related product manuals