EVS Broadcast Equipment SA
Issue 2.0.7.2 September 2021
40 Processing Module Installation and Cabling
Note
• The Topology Setting must be identical for all Processing
Modules contributing to a Production Cluster (those which
have the same Cluster ID).
• For proper network settings and validated devices, please
refer to the limited version of the EVS Network Design
Guide.
• For support on network switches and their configuration,
contact your EVS Technical Support.
• On how to configure Processing Modules to Dyvi-
‘Productions’ please refer to Supervisor section.