EasyManua.ls Logo

EXFO FTB-860 - Page 204

EXFO FTB-860
675 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Test Setup - Test Configurator, Timer, and System
192 FTB-700G/800 Series
Network Details (iSAM)
Performance Test check box when selected (default) verifies that the
SLA parameters (FD, IFDV, and FLR) are met over time by running
multiple services simultaneously. Results are measured and compared
to the configured thresholds to declare the pass/fail verdicts. The
Performance Test is only performed for services that have their CIR
check box selected.
Set the Performance Test duration in hh:mm format: 1 minute to
24 hours (default is 10 minutes).
RFC 6349 Test on Service 1 check box when selected (cleared by
default) verifies that the Ethernet service is able to properly carry TCP
traffic; Service 1 is used to performed the RFC 6349 test. Enabling the
RFC 6349 Test on Service 1 automatically set the operation mode to
DTS and the layer to L3/L4; direction is bidirectional, max MTU is 1500
bytes, multiple connections as well as Path MTU Discovery are
enabled.
Duration: The field next to the RFC 6349 Test on Service 1 check box
is used to set the duration of the TCP Throughput phase per direction in
hh:mm format: 1 minute (default) to 24 hours.
Threshold (% of ideal) allows to enter the TCP Throughput as a
percentage of the Ideal L4 Throughput that will be used to declare the
pass/fail verdict for both directions: 0 to 100%; default is %.

Table of Contents

Related product manuals