Test Results
NetBlazer 423
Summary (NI/CSU Emulation)
Summary (NI/CSU Emulation)
From the Test menu, tap Results, and the Summary tab.
Status
Status indicates the progress of the cable test as follows:
Idle (test has not started)
In Progress
Completed
The Pass/Fail verdict is displayed next to the Test Status field, when
enabled, based on the following criteria: The worst pair’s Wire Map,
Prop. Delay, Delay Skew, and Length.
Start Time
Indicates the date and time the test has been started. The date and time is
reset every time the test is restarted or reset.
Auto-Response/Manual Loopback Status
Indicates the status of the loopback:
Loopback Active
No Loopback.
Interface
See Interface on page 311 for more information on Interface alarms/errors.
DS1
See DS1 on page 300 for more information on DS1 alarms/errors.