4. Commissioning
4-28
Festo P.BE-SPC11-SYS-ASI -EN en 0203NH
4.4.1 Switch-on behaviour after successful commissioning
If commissioning has already been carried out, the SPC11 is
ready to operate after a few seconds.
Start: Switch-on
behaviour
Display of
system parameters
Display of
amplification stage
Display of
cushioning stage
Position
P.01 or P.02?
SPC11 is ready to operate.
Theaxisispressedactively
intothe endpositionandwaits
for the positioning t ask.
SPC11 is ready to operate.
The axis stands uncontrolled
and waits for the positioning
task.
Yes No
Wait approx. 1 second
Wait approx. 1 second
Wait approx. 1 second
Current value
Current value
Current value
Firmware version
number
Display of
firmware version
Wait approx.0.5 second
Fig. 4/5: Switching-on behaviour of the SPC11 after commissioning