Hardware Installation Installing/Removing the Server in/from the Rac
3rd party rack
Certain general conditions must be met:
– Installation dimensions (see the dimensions shown in figure 2 on page 34):
– You must ensure that the safety mechanisms on the server, e.g. stoppers or
retaining systems, are functioning correctly.
– The shape of the rack support uprights must ensure that the rails can be
bolted to the front.
– Telescopic rails screwed to the front
The rails have a linear alignment feature to ensure that they can be adjusted
to different rack depths.
– No support of the cable management (delivered with the mounting kit).
– Climatic conditions.
An unobstructed air intake in the rack front and air discharge in the rear
cover of the rack are essential for ventilation of the installed server.
1 Front of rack
2 Rear of rack
A Rack depth (comparison PRIMECENTER Rack 940/1000 mm)
B Rack width (comparison PRIMECENTER Rack 700 mm)
C Clearance for 19" installation level
C1 Front 19" installation level
C2 Rear 19" installation level
D Cable routing area (cable area depth) and ventilation
E Space for front panel and ventilation
F Space for right and left support systems
P PRIMERGY rack installation depth
a1 Front left support upright
a2 Front right support upright
b1 Rear left support upright
b2 Rear right support upright