EasyManua.ls Logo

GE AKTA ready - Page 110

GE AKTA ready
227 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ActionStep
Remove the protective end cap from
inlet tube 5 (arrow), and connect the
test solution.
Note:
If ÄKTA ready gradient is installed use
inlet tube 7.
2
Remove the protective end cap from
outlet 6 (arrow), and connect a waste
hose to this outlet.
3
WARNING
Over-pressure. Never block the outlet tubing with, for instance,
stop plugs, since this will create over-pressure and might result in
injury.
110 ÄKTA ready Operating Instructions 28960345 AD
8 Component test
8.1 Run a component test

Table of Contents

Related product manuals