EasyManua.ls Logo

GE Brivo OEC 715 - Page 127

GE Brivo OEC 715
210 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Special Applications
Page 6-20
Dose Summary:
RDSR: X-Ray Radiation Dose Structured Reporting
SC: Secondary Capture image
Send RDSR on Complete: Check it when you want to send RDSR on completing an exam.
4. Select the Verify button to verify that the server is connected. A verified successful message appears if
the server has connected.
5. Check Enable Storage Commitment to setup commitment server.
6. Obtain the following commitment information from your network administrator and enter it:
AE Title: DICOM Application Entity Title.
IP Address: Unique IP address assigned to the server you are configuring.
Port Number: Port number assigned to the commitment device.
Time Out: The time in seconds that the Workstation waits for a response from the server before timing out.
7. Check Use Storage Server Settings if you want to use storage server setting. The commitment
information will be displayed automatically.
8. Select the Verify button to verify that the commitment server is connected. A verified successful
message appears if the server has connected.

Table of Contents

Other manuals for GE Brivo OEC 715

Related product manuals