EasyManua.ls Logo

GE Invenia ABUS 2.0 - Page 85

GE Invenia ABUS 2.0
278 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Receiving and Unpacking the Equipment
Invenia ABUS 2.0 – System Setup and Basic Service Manual 3-11
4700-0043-00 Rev. 4
3. Remove the top of the crate.
a. Use the pry tool to lift all
of the metal tabs along
the top of the crate.
b. Lift the crate top until it
clears the metal tabs, and
set aside.
NOTE: Ensure that the metal
tabs are straightened until they
are vertical, or the top will be
difficult to remove.
Table 3-3: Unpacking the Invenia ABUS 2.0 (for Size 1715x845x1650mm)
Step Description Illustration

Table of Contents

Related product manuals