EasyManua.ls Logo

GE LOGIQ 5

GE LOGIQ 5
452 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GE MEDICAL SYSTEMS
DIRECTION 2300000, REVISION 2 LOGIQ™5 SERVICE MANUAL
8-16 Section 8-4 - Keyboard Block
8-4-1-4 Removal Procedure (cont’d)
4.) Disconnect three connectors (6-8) from the HUB board. Refer to Figure 8-20.
5.) Disconnect two connectors (9-10). Refer to Figure 8-21.
6.) Carefully lift the Keyboard assy from the system.
7.) Perform the following functional tests. If all are successful, include the debrief script provided below.
8-4-1-5 Mounting Procedure
Install the new parts in the reverse order of removal.
Figure 8-20 Disconnect 3 connectors from the HUB
Figure 8-21 Disconnect two connectors
Table 8-8 Functional Tests
Service Manual
Section Functional Test / Diagnostic Test Debrief Script
Section 4-3-1
Power On/Boot Up
“Service Manual, Direction
2300000, Rev 1+, Section 8-4-1. Equipment
passed all required tests and is ready for use. “
Section 4-3-2
Power Off / Shutdown
Section 4-7-1
Main Keyboard Assy validation
Section 4-3-4
System B/M-Mode Checks
Section 4-3-5
System CFM and PWD Checks
Section 10-5-2
Functional Checks (See Also Chapter 4)
6
7
8
HUB Board
9
10

Table of Contents

Related product manuals