EasyManua.ls Logo

GE Solar 8000M/i - Page 80

GE Solar 8000M/i
192 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4-28 Solar 8000M/i patient monitor 2026265-075C
Maintenance and checkout: Checkout procedure
10. Set the LIGHT and MODULATION switches as follows:
Set the LIGHT switch to LOW.
Set the MODULATION switch to HIGH.
Set the RATE switch to 201.
11. Verify the following SpO2 readings for saturation and pulse rate:
Saturation (%): 81 ± 2
Rate (bpm): 201 ± 3% (195 to 207)
NBP calibration check
1. Connect the acquisition device to the patient monitor.
2. Disconnect all parameter cables.
3. Apply power to the patient monitor.
4. Make sure the power indicator on the acquisition device’s front panel
is ON (green).
WARNING
Do not put the NBP cuff around a human limb during the
checkout procedure due to the potential for injury. When
the NBP cuff is used in this procedure, it must be tightly
wrapped around a rigid cylinder or pipe.
5. Connect a manometer and NBP cuff to the NBP connector on the
front of the acquisition device.
Connect to
acquisition device
454A

Table of Contents

Related product manuals