Applications Zoom | 161
Field Description
dLi Longitudinal offset: Positive if measured point is further along the
construction line from the start point.
dOf Perpendicular offset: Positive if measured point is to the right of the
construction line.
d HGT Calculated difference in height: Positive if measured point is higher
than the construction line start point height.