EasyManua.ls Logo

Heyer Modular+ - Page 74

Heyer Modular+
114 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Preventive Maintenance
74
3 Conduct Proportional valve (PV) verification test, with the patient module removed.
(Skip to step 3-m if already in the Test menu with the removed patient module)
a Remove the CO
2
absorber dome.
b Remove the bag in bottle system.
c Remove the O
2
cell cable from the O
2
cell.
d Remove the scavenger hose.
e Remove the breathing circuit.
f Turn the locking handle 18 counterclockwise
g Pull out the patient module.
h Select the Select the keys.
i)
SET
ii)
OPT.
iii)
iv)
OK
i Select KEYCODE to enter the diagnostic screens.
j Enter a valid key code to invoke the service software.
k Advance from this window to the main menu by pressing ENTER.
l Select TEST MENU.
m While in the Test Menu, select CHARAC. PV.

Table of Contents

Related product manuals