EasyManua.ls Logo

Heyer Pasithec - Operating the HEYER Pasithec; System Startup Procedures

Heyer Pasithec
106 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
H E Y E R P a s i t h e c
34 / 106 HEYER Pasithec, Operator’s manual Rev. 0.2 Draft - 12/09
4 Operating Guide
4.1 Startup
Step 1: Connect Main Supply and Gas Supply
Plug the power cord into the AC power outlet and connect the pipeline gas supply and standby gas
supply. Turn on the cylinder valve of the standby gas supply and turn off the flowmeters of O
2
, N
2
O,
Air, and Aux. O
2
.
Step 2: Turn on the Power Switch
Turn the Power Switch to “ON”. The UI will power on and perform a System Self Test.
4.1.1 System Self Test
When the UI is powered on, the startup interface is displayed, followed by the LOGO interface.
Figure 4-1 LOGO Interface
The System Self Test interface will appear after the LOGO interface.
Figure 4-2 System Self Test Interface

Table of Contents

Related product manuals