H E Y E R P a s i t h e c
52 / 106 HEYER Pasithec, Operator’s manual Rev. 0.2 Draft - 12/09
11 System preparation:
•
Close all vaporizers.
•
Open the APL valve.
•
Set the bag / ventilator switch to “Bag Control”.
•
Set all flow controls to minimum.
WARNING: Be sure that the breathing system is correctly connected.
WARNING: Flush the anesthesia machine for at least one minute by using O
2
with 5
L/min flow speed to remove unnecessary mixed gas and objects in the
system before connecting the equipment to the patient end.
WARNING: Anesthesia equipment must be connected to the waste gas scavenging
system to prevent the bodily injury. This must be followed during testing
and clinical application.