EasyManua.ls Logo

Heyer Pasithec - Page 52

Heyer Pasithec
106 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
H E Y E R P a s i t h e c
52 / 106 HEYER Pasithec, Operator’s manual Rev. 0.2 Draft - 12/09
11 System preparation:
Close all vaporizers.
Open the APL valve.
Set the bag / ventilator switch to “Bag Control”.
Set all flow controls to minimum.
WARNING: Be sure that the breathing system is correctly connected.
WARNING: Flush the anesthesia machine for at least one minute by using O
2
with 5
L/min flow speed to remove unnecessary mixed gas and objects in the
system before connecting the equipment to the patient end.
WARNING: Anesthesia equipment must be connected to the waste gas scavenging
system to prevent the bodily injury. This must be followed during testing
and clinical application.

Table of Contents

Related product manuals