1 Lift the external control termi-
nal block cover.
2 Loosen the terminal block
screws, insert the bare ends of
the leads, and tighten the
screws.
3 Connect to the measurement
object.
4 Replace the cover on the exter-
nal control terminal block.
Connect the '+' wire to the ALM1 (or
ALM2 to ALM4) terminal.
Connect the '-' wire to a GND termi-
nal.
Five GND terminals are provided.
Connections can be made to any
GND terminal.
GND
2
3