EasyManua.ls Logo

HP ProLiant DL20 Gen10 - Page 120

HP ProLiant DL20 Gen10
257 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
14. Install the access panel .
15. Install the server into the rack .
16. Connect all peripheral cables to the server.
17. Connect the power cords:
a. Connect each power cord to the server.
b. Connect each power cord to the power source.
18. Power up the server .
19. If removed, install the front bezel .
The installation is complete.
Installing an M.2 NVMe SSD on the M.2 SSD/dedicated iLO/serial port enablement board 120

Table of Contents

Related product manuals