HP ProLiant DL20 Gen10 - Installing an SFF Hot-Plug Drive

HP ProLiant DL20 Gen10
257 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installing an SFF hot-plug driveInstalling an SFF hot-plug drive
CAUTION: CAUTION: To prevent improper cooling and thermal damage, do not operate the server unless all bays are populated
with either a component or a blank.
ProcedureProcedure
1. If installed, remove the front bezel .
2. Remove the drive blank.
3. Prepare the drive.
4. Install the drive.
5. If removed, install the front bezel .
6. Determine the status of the drive from the drive LED definitions .
The installation is complete.
To configure arrays, see the HPE Smart Array SR Gen10 Configuration Guide at the Hewlett Packard Enterprise websiteHewlett Packard Enterprise website .
Installing an SFF hot-plug drive 77