EasyManua.ls Logo

HP ProLiant DL20 Gen10 - Page 127

HP ProLiant DL20 Gen10
257 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
9. Cable the controller .
10. Install the riser cage.
11. Install the access panel .
12. Install the server into the rack .
13. Connect all peripheral cables to the server.
14. Connect the power cords:
a. Connect each power cord to the server.
b. Connect each power cord to the power source.
15. Configure the controller .
16. If removed, install the front bezel .
The installation is complete.
Installing a modular Smart Array controller option (type-a, AROC) 127

Table of Contents

Related product manuals