EasyManua.ls Logo

HPE ProLiant DL345 Gen11 - Procedure

HPE ProLiant DL345 Gen11
341 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ProcedureProcedure
1. Power down the server.
2. If installed, open the cable management arm.
3. Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
4. Disconnect all peripheral cables from the server.
5. Do one of the following:
Extend the server from the rack .
Remove the server from the rack .
6. Remove the left chassis ear:
a. Remove left chassis ear screws (callouts 1).
Retain all screws for future use.
b. Detach the left chassis ear (callout 2).
HPE ProLiant DL345 Gen11 Server Service and Maintenance Guide 118

Table of Contents

Related product manuals