EasyManua.ls Logo

HPE ProLiant DL345 Gen11 - Rack mounting interfaces; Remove the midplane drive cage; Procedure

HPE ProLiant DL345 Gen11
341 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Rack mounting interfacesRack mounting interfaces
The rack rails can be installed in a rack that has the following mounting interfaces:
Round-hole Square-hole Threaded round-hole
The illustrations used in this procedure show an icon on the upper right corner of the image. This icon indicates the type of mounting
interface for which the action illustrated in the image is valid.
Remove the midplane drive cageRemove the midplane drive cage
ProcedureProcedure
1. Power down the server.
2. If installed, open the cable management arm.
HPE ProLiant DL345 Gen11 Server Service and Maintenance Guide 49

Table of Contents

Related product manuals