EasyManua.ls Logo

HPE ProLiant DL345 Gen11 - Procedure

HPE ProLiant DL345 Gen11
341 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ProcedureProcedure
1. Power down the server.
2. If installed, open the cable management arm.
3. Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
4. Disconnect all peripheral cables from the server.
5. Remove the server from the rack .
6. Place the server on a flat, level work surface.
7. Remove the access panel.
8. Remove the fan cage.
9. Remove the midwall bracket.
10. Disconnect all cables from the drive backplanes.
11. Remove the drive backplane bracket screws.
HPE ProLiant DL345 Gen11 Server Service and Maintenance Guide 57

Table of Contents

Related product manuals