EasyManua.ls Logo

HPE ProLiant DL385 Gen10 - Page 38

HPE ProLiant DL385 Gen10
177 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4. Connect the power cord to the rear of the server.
5. Install the power cord anchors.
6. Secure the cables to the cable management arm.
IMPORTANT:
When using cable management arm components, be sure to leave enough slack in each of the
cables to prevent damage to the cables when the server is extended from the rack.
7. Connect the power cord to the AC power source.
38 Operations

Table of Contents

Other manuals for HPE ProLiant DL385 Gen10

Related product manuals