• Extend the server from the rack.
• Remove the server from the rack.
5. Remove the access panel.
6. Remove the rear wall blank.
7. Install any expansion boards, if needed.
8. Install the riser cage:
The installation is complete.
Installing a tertiary riser cage
Prerequisites
Before installing this option, be sure that you have the following:
Installing a tertiary riser cage 99