EasyManua.ls Logo

HPE ProLiant DL385 Gen10 - Installing an M.2 Drive

HPE ProLiant DL385 Gen10
177 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4. Power on the server.
To configure the drive, use HPE Smart Storage Administrator.
Installing an M.2 drive
This procedure is for replacing M.2 drives located on an expansion card, riser, or the system board only.
Do not use this procedure to replace uFF drives.
Prerequisites
Before installing this option, be sure that you have the following:
• The components included with the hardware option kit
• T-10 Torx screwdriver
Procedure
1. Power down the server .
2. Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
3. Do one of the following:
• Extend the server from the rack.
• Remove the server from the rack .
4. Remove the access panel.
5. Remove the riser cage.
6. Install the drive.
Installing an M.2 drive 61

Table of Contents

Other manuals for HPE ProLiant DL385 Gen10

Related product manuals