Installing primary and secondary risers
Prerequisites
Before installing this option, be sure that you have the following:
• The components included with the hardware option kit
• T-10 Torx screwdriver
Procedure
1. Power down the server .
2. Do one of the following:
• Disconnect each power cord from the power source.
• Disconnect each power cord from the server.
3. Do one of the following:
•
Extend the server from the rack.
• Remove the server from the rack.
4. Remove the access panel.
5. Remove the riser cage.
6. Remove the riser board.
7. Install the riser.
96 Installing primary and secondary risers