EasyManua.ls Logo

HPE ProLiant DL385 Gen10 - Installing a Secondary Riser Cage

HPE ProLiant DL385 Gen10
177 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
7. Install any expansion cards, if needed.
8. Connect any data cables to riser or expansion boards.
9. Install the tertiary riser cage.
10. Connect cables to drive backplanes, if needed.
The installation is complete.
Installing a secondary riser cage
Prerequisites
Before installing this option, be sure that you have the following:
• The components included with the hardware option kit
• T-10 Torx screwdriver
Procedure
1. Observe the following alert:
CAUTION:
To prevent damage to the server or expansion boards, power down the server and remove all
AC power cords before removing or installing the PCI riser cage.
2. Power down the server.
3. Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
4. Do one of the following:
98 Installing a secondary riser cage

Table of Contents

Other manuals for HPE ProLiant DL385 Gen10

Related product manuals