Figure 10-4 Installing the equi-potential cable (scenario 2)
Step 4 Route the cable by referring to 12.1 Cabling Requirements, and then use cable ties to bind the
cable.
Step 5 Attach labels to the installed cable. For details, see Attaching a Sign Plate Label.
----End
BTS3900A(Ver.B)
Installation Guide 10 Installing the PGND Cable and Equi-potential Cable
Issue 01 (2011-10-25) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
56