Figure 11-9 Binding cables on the left side
(1) PGND cable (2) Jumpers on the left side (3) DCDU input power cables in the
capacity expansion scenarios
(4) DCDU input power cable (5) CPRI fiber optic cable -
BTS3900L (Ver.C)
Installation Guide 11 Installing the Cables
Issue 07 (2013-11-08) Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
71