Requirements for the Wall and Ground
Concrete walls and brick walls are recommended. Do not use sandwich panel
or wooden walls.
The bearing capacity of the ground must be greater than or equal to 500
kg/m
2
.
Installation Dimensions
Reserve
sucient clearance around the product for installation and heat
dissipation.
Figure 6-1 Installation dimensions for one product
Figure 6-2 Installation space for a parallel system or capacity expansion scenario
iSitePower-M (MAP05A1, MAB05B1)
User Manual 6 System Installation
Issue 02 (2021-12-30) Copyright © Huawei Digital Power Technologies Co., Ltd. 44